Archi-Technology, LLC
  • Markets
    • School Districts >
      • Facility Managers
    • Higher Education
    • Healthcare
    • Architects and CMs
    • Government
  • Services
    • Strategic Consulting >
      • Comprehensive Tech Plans >
        • Technology Conditions Surveys
        • TR Master Plans
        • 10-Year Roadmaps
      • Technology Funding Plans >
        • Federal Funding Plans
        • NYS Funding Plans
        • K12 Funding data sheets
    • Design/Build Services >
      • Technology Design/Build
      • Design QA/Build QC
  • About
    • Our Team
    • The value of an RCDD
    • GSA contract
    • FAQs
    • Careers
    • Contact
  • Resources
    • Infrastructure & Systems
    • Comprehensive Planning
    • Services
    • Projects
  • EFR
    • News >
      • New Content Notification Form
  • COVID-19
    • COVID19 K12 Tech Planning Kit
    • COVID19 K12 HVAC Asset Survey Services
    • Our COVID19 Response Policies
Picture
Peckham Hall/Integrated Center for Math & Science
Communications Infrastructure (including AV and Security)
Client Background​
Nazareth College—or "Naz" for short—is a private college in Pittsford, New York, a suburb of Rochester, New York, that offers 60+ undergraduate majors and more than two dozen graduate programs.
     Nazareth offers more than 60 four-year undergraduate programs, more than 20 master's degree programs, a Doctorate of Physical Therapy, and three post-baccalaureate certificate programs. In 2017, there were 2,034 undergraduates and 789 postgraduate students. (Source: Wikipedia)

​​Project Description
New construction a 74,000 sq/ft building with four floors devoted to learning space. The building program space includes eight classrooms and laboratory lecture rooms that offer state-of-the-art technology and 20 labs to serve biology, chemistry, physics, math, computing and ecology.
     As part of the overall project, AV support was integrated into ten classrooms, 12 labs and one seminar room. One of the key elements of the technology integrated was the need to help prepare the teachers of tomorrow. Each room features an interactive white board and support for modern laptops and imaging equipment, analogous to what is seen in an ever-increasing number of elementary and high school classrooms.
​     The end users goals needed to be balanced with the college’s standards and five-year technology plan.
Services Provided
  • Budgeting
  • Strategic planning
  • ​Design/construction management services
Systems Design and Coordinated
  • Exterior conduits and entrance facilities
  • Interior cable plant from data center to new Technology Rooms and all associated backbone and horizontal cabling
  • Voice and data systems
  • Classrooms and laboratory AV systems
  • Access control
  • Video surveillance
View this Project Profile in PDF format.
Picture
​​Archi-Technology's Role​​
Archi-Technology was the lead technology designer for this project as well as the project coordinator of Nazareth staff, vendors and contractors. Technology Construction Management (TCM) services were also used by Nazareth to ensure correct vendor installation and interoperability of the technology infrastructure and interconnected systems.
​

Challenges
  • AV systems coordination with lab equipment and differing presentation and teaching styles by faculty.
  • Integrating the technology with architectural constraints was a key aspect to trying to ensure the room remained functional while still being aesthetically pleasing.
  • The science labs posed an interesting design challenge of how to incorporate the interactive whiteboard, PC, controls and auxiliary inputs into an area with no usable wall space or dedicated teaching location. Ultimately, all were able to be concealed into the millwork and behind a set of sliding white boards; when not in use they are completely invisible to the end user.

​Statistics
  • Total Program Cost: $30,000,000
  • Firm Responsibility Cost: $1,000,000
  • Total AV Project Cost: $375,000
  • Completion Date: 2012

​​Client
  • Nazareth College, Rochester, NY
< Syracuse University Setnor School of Music
Unity Health Systems Hospital Modernization and Expansion >
Valuable resources for your current or next technology project.
Discover a wealth of free planning resources to help you take control of your organization's technology initiatives from planning and programming through design, construction and management. Visit our Resources section.
Picture
The Anatomy of NYS Aid for Building Conditions Survey infographic (PDF)
Featured Resource
Anatomy of NYS Aid for Building Conditions Surveys.

Is your school district leaving available state aid on the table that could be used to assess and document technology infrastructure and IP-based building systems such as instructional technology and security systems? View PDF.
Home
School Districts
Planning services
Design Services
GSA Contract
Portfolio
Archi-Technology LLC©2020. All rights reserved.     585.424.1952
  • Markets
    • School Districts >
      • Facility Managers
    • Higher Education
    • Healthcare
    • Architects and CMs
    • Government
  • Services
    • Strategic Consulting >
      • Comprehensive Tech Plans >
        • Technology Conditions Surveys
        • TR Master Plans
        • 10-Year Roadmaps
      • Technology Funding Plans >
        • Federal Funding Plans
        • NYS Funding Plans
        • K12 Funding data sheets
    • Design/Build Services >
      • Technology Design/Build
      • Design QA/Build QC
  • About
    • Our Team
    • The value of an RCDD
    • GSA contract
    • FAQs
    • Careers
    • Contact
  • Resources
    • Infrastructure & Systems
    • Comprehensive Planning
    • Services
    • Projects
  • EFR
    • News >
      • New Content Notification Form
  • COVID-19
    • COVID19 K12 Tech Planning Kit
    • COVID19 K12 HVAC Asset Survey Services
    • Our COVID19 Response Policies